The frame arrived Monday, Dec. 10th. Trucks were slightly delayed due to the ice storm in Kansas and Missouri. Tuesday and Wednesday we erected the first floor. Thursday we started on the second floor, but had to stop at noon on Friday due to high winds and blowing snow. Saturday, December 15th was a good clear day so we were able to get a portion of the second floor erected. Pictures posted are from Thursday, Friday and Saturday. First photo is rear elevation. Area will be backfilled up to the base of the doors. Next photos are the front elevations. Last two are a closeup of Mark operating the truck crane and the timber being hoisted.