Wednesday, December 19, 2007

December 17-18, 2007 Progress







Work on the second floor continued with the use of the truck crane. There are four in the crew this week. This series shows work on the second floor. First picture is the rear elevation taken from the rear of the back "yard." Next two pictures are the front elevation before the great room is added to the rear. Fourth one is a vertical shot of Mark operating the crane with Abe up on the second floor. Last photo is the garage side of the house. (right side elevation).